Word Document of 35 Pages
Using the system operational requirements document (ORD) as a baseline, develop the system test and evaluation master plan (TEMP).
Specifically, the test and evaluation management plan (TEMP) must consider the following (Blanchard & Fabrycky, 2006):
1. Identify tests to be accomplished and items to be evaluated. As defined in the text, show the layout and evolution of the test requirements. Show how you intend to test the items from the operational requirements documents to ensure that the requirements are met.
2. Identify the office of primary responsibility for conducting the tests and the personnel and facilities to provide ongoing test support.
3. Include a description of the test location, including the local political, economic, and social factors, logistics, and test environment (e.g., arctic, desert, mountainous, or flat terrain, facilities, safety, and security concerns).
4. Include a description of the test preparation phase for each testing as required.
5. Include a description of the formal test phase.
6. Plan to determine when to reject test results and retest.
7. Provide a description of the final test report, including any recommendations for corrective action, format, distribution, and feedback.
Any figures, tables, or other supporting documentation needs to be pasted in the Word document.
Reference
Blanchard, B. S., & Fabrycky, W. J. (2006). Systems engineering and analysis (4th ed.). Upper Saddle River, NJ: Prentice Hall.